top of page
Water & Utilities
Port of Long Beach - Pier B
The Port of Long Beach is reconfiguring, expanding, and enhancing the existing Pier B rail yard as part of this $1.547 billion program.
D'Leon engineers have led efforts in utilities, pipeline design, and drainage.
PROJECT DETAILS
OWNER
PORT OF LONG BEACH
CLIENT
N/A
COST
$1.6B
SERVICES
CIVIL ENGINEERING
bottom of page