The Regional Connector is a 1.2 mile transit project in downtown Los Angeles extending from Metro Center station (7th Street/Flower Street) to the historic Little Tokyo district. The Regional Connector will provide an important link the existing Gold Line and Exposition light rail lines.
DLCE provided support services for the all underground alignments (tunnel and underground stations) along Flower Street and Hope Street all the way to Alameda Boulevard (Little Tokyo). Prepared and identified all major utilities including: gas, water, power, storm drain, sanitary sewer and communication lines to accommodate relocation.
PROJECT DETAILS
OWNER
LA METRO
CLIENT
DBB
COST
$1.8B
SERVICES
CIVIL ENGINEERING